Return to search results
💡 Advanced Search Tip
Search by organization or tag to find related datasets
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement. This document details the IO&M and safety procedures for each system and subsystem in the Triton-C WEC.
Complete Metadata
| bureauCode |
[ "019:20" ] |
|---|---|
| dataQuality | true |
| identifier | https://data.openei.org/submissions/8557 |
| issued | 2020-11-02T07:00:00Z |
| landingPage | https://mhkdr.openei.org/submissions/338 |
| programCode |
[ "019:009" ] |
| projectLead | Bill McShane |
| projectNumber | EE0007819 |
| projectTitle | Demonstration of an Advanced Multi-Mode Point Absorber for Wave Energy Conversion |
| spatial | {"type":"Polygon","coordinates":[[[-124.30879375,45.62959980117794],[-120.45269375,45.62959980117794],[-120.45269375,49.14884179274314],[-124.30879375,49.14884179274314],[-124.30879375,45.62959980117794]]]} |