Skip to main content
U.S. flag

An official website of the United States government

Return to search results
💡 Advanced Search Tip

Search by organization or tag to find related datasets

Simulink Model of a New Energy EVG-005 5kW Hydropower Turbine

Published by University of Alaska Fairbanks | Department of Energy | Metadata Last Checked: June 28, 2025 | Last Modified: 2023-10-10T16:18:22Z
Simulink model for a New Energy 5kW hydropower turbine. ADCP data ("ds_streamwise_7_13.nc") and DC voltage, DC current, and rotor rotation observed from the New Energy EVG-005 Current Energy Converter (CEC) ("electrical_7_13_10ohms.nc") were collected at the Tanana River Test Site (TRTS) near Nenana Alaska. - Data was collected on July 13th, 2023 with a constant 10 ohms resistance applied with a DC load bank. - Simulink model is meant to resemble the electrical setup at the TRTS. - Model is initialized by running the "NewEnergy_2023_10hz.m" Matlab script. Then the Simulink model ("New_Energy_Model_PMSM.slx") can be run. - Results are processed with the "NewEnergy_2023_processing.m" Matlab code. The Matlab results are also saved in the "New_Energy_7_13_model_validation_results.mat" Matlab file. This can be directly loaded into the Matlab Workspace using the "Load()" command. - The timetable variables "electrical_model_downsampled" is the model results and the "electrical_limited" is the experimental data from the TRTS.

Complete Metadata

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov