Skip to main content
U.S. flag

An official website of the United States government

Return to search results
💡 Advanced Search Tip

Search by organization or tag to find related datasets

NEVI 2 Corridor Groups (December 9 2024)

Published by California Energy Commission | State of California | Metadata Last Checked: July 09, 2025 | Last Modified: 2025-02-28T17:44:23.973Z
<span style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'>California-designated corridors are grouped by location and number of new charging stations required under NEVI. </span><div style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'><br /></div><div style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif;'><b>Data Dictionary:</b><div><ul><li><b>Corridor Segment </b>- <span style='font-family:inherit;'>A portion of a highway corridor.</span></li><li><b>Corridor Group </b>- A group of one or more corridor segments.  </li><li><b>Alternative Fuel Corridor </b>- The U.S. Department of Transportation Federal Highway Administration (FHWA) designates a national network of plug-in electric vehicle (EV) charging and hydrogen, propane, and natural gas fueling infrastructure along national highway system corridors. To designate these Alternative Fuel Corridors (AFC), FHWA solicits nominations from state and local officials and works with other federal officials and industry stakeholders.</li><li><b>Minimum Charging Stations Required </b>- The minimum number of charging stations a corridor segment must have to be eligible for funding for Round 2 of California’s NEVI program solicitation. </li><li><b>Minimum Ports Required </b>- The minimum number of new ports a corridor segment must have to be eligible for funding for Round 2 of California’s NEVI program solicitation.</li><li><b>Needed Locations </b><span style='font-size:16px;'>- </span><font size='3'>Locations where charging stations need to be sited to ensure the NEVI 50-mile station placement requirement is met for all routes of travel from one AFC to another, if applicable.</font></li></ul></div></div>

Find Related Datasets

Click any tag below to search for similar datasets

Complete Metadata

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov