Return to search results
💡 Advanced Search Tip
Search by organization or tag to find related datasets
February 2014 Dixie Valley Binary Cycle Cost Data
Dixie Valley Binary Plant Monthly Costs from February, 2014. Includes cost and man-hour data demonstrating the technical and economic feasibility of utilizing the available unused heat to generate additional electric power from a binary power plant from the low-temperature brine at the plant.
Complete Metadata
| bureauCode |
[ "019:20" ] |
|---|---|
| dataQuality | true |
| DOI | 10.15121/1148728 |
| identifier | https://data.openei.org/submissions/6686 |
| issued | 2014-03-10T06:00:00Z |
| landingPage | https://gdr.openei.org/submissions/348 |
| programCode |
[ "019:006" ] |
| projectLead | Tim Reinhardt |
| projectNumber | EE0002860 |
| projectTitle | Recovery Act: Topic Area 2A: Geothermal Energy Production from Low-Temperature Resources - Dixie Valley Bottoming Binary Project |
| spatial | {"type":"Polygon","coordinates":[[[-118.055074,39.767665],[-117.655074,39.767665],[-117.655074,40.167665],[-118.055074,40.167665],[-118.055074,39.767665]]]} |